The Marina Upgrade Plan
With the upgrade of on-water marina facilities now completed, and with the marina positioned for the remaining years of the existing lease, it is time to look forward to the development of the shore based assets.
More than 2.5 hectares of land are ready for the development of a major tourist destination – including a 100 room tourist facility featuring hotel and stand-alone accommodation. In addition, increased berthing facilities to cater for “super-yachts” is planned for the 200 meter frontage to the Clarence River. A new lease of up to 100 years is possible based on development investment (NSW Govt. Policy).
2015
Development Approval
Confirmation from Clarence Valley Council that a development approval is in place for additional 43+ berths.
2016
On Water Upgrades Stage 1
Marina arms A and B completed.
Main walkway from car park to B arm and visitor berths completed.
Additional moorings added bringing total moorings to 21.2017
On Water Upgrades Stage 2
On water upgrade to marina main C arm.
All C arm berths completed.2018
On Water Upgrades Stage 3
Upgrades & repairs to floating fuel dock, hire boat dock and work berths completed.
Main walkway to D arm and all of D arm berths completed.2018
Clean Marina Re-accreditation
In December 2018 Yamba Marina was re-accredited as a Level 3 Clean Marina through until December 2021.
2019
Future Upgrades
Car park upgrade, reconfiguration of storage area.
Design layout for additional berths to be completed.
Tendering and construction of additional berths.
Concept plans and design for on-shore development of accommodation and commercial facilities begin.2020+
Long Term Strategic Plan Underway
Additional marina berth construction completed.
Development begins for on shore infrastructure.
2015
Development Approval
Confirmation from Clarence Valley Council that a development approval is in place for additional 43+ berths.
2016
On Water Upgrades Stage 1
Marina arms A and B completed.
Main walkway from car park to B arm and visitor berths completed.
Additional moorings added bringing total moorings to 21.2017
On Water Upgrades Stage 2
On water upgrade to marina main C arm.
All C arm berths completed.2018
On Water Upgrades Stage 3
Upgrades & repairs to floating fuel dock, hire boat dock and work berths completed.
Main walkway to D arm and all of D arm berths completed.2018
Clean Marina Re-accreditation
In December 2018 Yamba Marina was re-accredited as a Level 3 Clean Marina through until December 2021.
2019
Future Upgrades
Car park upgrade, reconfiguration of storage area.
Design layout for additional berths to be completed.
Tendering and construction of additional berths.
Concept plans and design for on-shore development of accommodation and commercial facilities begin.2020+
Long Term Strategic Plan Underway
Additional marina berth construction completed.
Development begins for on shore infrastructure.
About This Information
This page was last updated in September 2018. The detailed Marina Future Plan is available by appointment only.
Please contact us for the latest updates in the the Marina, or subscribe to our newsletter.
Sign up for our newsletter for regular emails on Yamba Marina news & developments!
The Marina Upgrade Plan
With the upgrade of on-water marina facilities now completed, and with the marina positioned for the remaining years of the existing lease, it is time to look forward to the development of the shore based assets.
More than 2.5 hectares of land are ready for the development of a major tourist destination – including a 100 room tourist facility featuring hotel and stand-alone accommodation. In addition, increased berthing facilities to cater for “super-yachts” is planned for the 200 meter frontage to the Clarence River. A new lease of up to 100 years is possible based on development investment (NSW Govt. Policy).
2015
Development Approval
Confirmation from Clarence Valley Council that a development approval is in place for additional 43+ berths.
2016
On Water Upgrades Stage 1
Marina arms A and B completed.
Main walkway from car park to B arm and visitor berths completed.
Additional moorings added bringing total moorings to 21.2017
On Water Upgrades Stage 2
On water upgrade to marina main C arm.
All C arm berths completed.2018
On Water Upgrades Stage 3
Upgrades & repairs to floating fuel dock, hire boat dock and work berths completed.
Main walkway to D arm and all of D arm berths completed.2018
Clean Marina Re-accreditation
In December 2018 Yamba Marina was re-accredited as a Level 3 Clean Marina through until December 2021.
2019
Future Upgrades
Car park upgrade, reconfiguration of storage area.
Design layout for additional berths to be completed.
Tendering and construction of additional berths.
Concept plans and design for on-shore development of accommodation and commercial facilities begin.2020+
Long Term Strategic Plan Underway
Additional marina berth construction completed.
Development begins for on shore infrastructure.
2015
Development Approval
Confirmation from Clarence Valley Council that a development approval is in place for additional 43+ berths.
2016
On Water Upgrades Stage 1
Marina arms A and B completed.
Main walkway from car park to B arm and visitor berths completed.
Additional moorings added bringing total moorings to 21.2017
On Water Upgrades Stage 2
On water upgrade to marina main C arm.
All C arm berths completed.2018
On Water Upgrades Stage 3
Upgrades & repairs to floating fuel dock, hire boat dock and work berths completed.
Main walkway to D arm and all of D arm berths completed.2018
Clean Marina Re-accreditation
In December 2018 Yamba Marina was re-accredited as a Level 3 Clean Marina through until December 2021.
2019
Future Upgrades
Car park upgrade, reconfiguration of storage area.
Design layout for additional berths to be completed.
Tendering and construction of additional berths.
Concept plans and design for on-shore development of accommodation and commercial facilities begin.2020+
Long Term Strategic Plan Underway
Additional marina berth construction completed.
Development begins for on shore infrastructure.
About This Information
This page was last updated in September 2018. The detailed Marina Future Plan is available by appointment only.
Please contact us for the latest updates in the the Marina, or subscribe to our newsletter.